fairpoint

Content tagged with "fairpoint"

Displaying 91 - 100 of 200

Vermont Draft Telecom Plan Fails to Deliver on Many Fronts

Last week, the Vermont Department of Public Service began a series of public hearings on the public comment draft of its State Telecommunications Plan. The plan is intended to asses the current state of the telecom landscape in Vermont, map out goals and benchmarks for the next 10 years, and provide recommendations for how to achieve them. The plan sets a target of 100 megabit per second symmetrical connections for every home and business in the state by 2024.

Oddly enough, achieving that even today would put them behind many metropolitan areas across the United States. The technology needed to deliver 100 Mbps connections is essentially the same that would be used to deliver 1 Gbps, begging the question why such a limited goal?

The 100/100 mbps symmetrical target is for 10 years into the future, but in the nearer term the plan calls for universal 4/1 Mbps coverage, raised to 10/1 Mbps coverage by 2020. While it may at first glance seem reasonable to set gradually rising targets, these long and short term goals actually have the potential to conflict with each other.

As pointed out by Vermont Public Radio, the 100/100 Mbps standard would likely require universal FTTH, or at least fiber to the node combined with other technological advances and investments. Meeting this goal would require a huge investment in next generation fiber optic infrastructure, yet the Telecommunications Plan calls for funding priorities to be focused on achieving universal 4/1 mbps coverage for the next 6 years. This lower standard will likely be met with a combination of last generation technologies like copper wire DSL and wireless that are incapable of meeting the 100/100 standard.

Continuing to build out older systems while deferring investments in fiber, which is adaptable to meet just about any future need, seems illogical. It’s a bit like saying you’re going to put all your expendable income for the next six years into repairing your VCR and buying tapes, while promising you’ll buy a DVD player immediately after. 

Vermont Draft Telecom Plan Fails to Deliver on Many Fronts

Last week, the Vermont Department of Public Service began a series of public hearings on the public comment draft of its State Telecommunications Plan. The plan is intended to asses the current state of the telecom landscape in Vermont, map out goals and benchmarks for the next 10 years, and provide recommendations for how to achieve them. The plan sets a target of 100 megabit per second symmetrical connections for every home and business in the state by 2024.

Oddly enough, achieving that even today would put them behind many metropolitan areas across the United States. The technology needed to deliver 100 Mbps connections is essentially the same that would be used to deliver 1 Gbps, begging the question why such a limited goal?

The 100/100 mbps symmetrical target is for 10 years into the future, but in the nearer term the plan calls for universal 4/1 Mbps coverage, raised to 10/1 Mbps coverage by 2020. While it may at first glance seem reasonable to set gradually rising targets, these long and short term goals actually have the potential to conflict with each other.

As pointed out by Vermont Public Radio, the 100/100 Mbps standard would likely require universal FTTH, or at least fiber to the node combined with other technological advances and investments. Meeting this goal would require a huge investment in next generation fiber optic infrastructure, yet the Telecommunications Plan calls for funding priorities to be focused on achieving universal 4/1 mbps coverage for the next 6 years. This lower standard will likely be met with a combination of last generation technologies like copper wire DSL and wireless that are incapable of meeting the 100/100 standard.

Continuing to build out older systems while deferring investments in fiber, which is adaptable to meet just about any future need, seems illogical. It’s a bit like saying you’re going to put all your expendable income for the next six years into repairing your VCR and buying tapes, while promising you’ll buy a DVD player immediately after. 

Vermont Draft Telecom Plan Fails to Deliver on Many Fronts

Last week, the Vermont Department of Public Service began a series of public hearings on the public comment draft of its State Telecommunications Plan. The plan is intended to asses the current state of the telecom landscape in Vermont, map out goals and benchmarks for the next 10 years, and provide recommendations for how to achieve them. The plan sets a target of 100 megabit per second symmetrical connections for every home and business in the state by 2024.

Oddly enough, achieving that even today would put them behind many metropolitan areas across the United States. The technology needed to deliver 100 Mbps connections is essentially the same that would be used to deliver 1 Gbps, begging the question why such a limited goal?

The 100/100 mbps symmetrical target is for 10 years into the future, but in the nearer term the plan calls for universal 4/1 Mbps coverage, raised to 10/1 Mbps coverage by 2020. While it may at first glance seem reasonable to set gradually rising targets, these long and short term goals actually have the potential to conflict with each other.

As pointed out by Vermont Public Radio, the 100/100 Mbps standard would likely require universal FTTH, or at least fiber to the node combined with other technological advances and investments. Meeting this goal would require a huge investment in next generation fiber optic infrastructure, yet the Telecommunications Plan calls for funding priorities to be focused on achieving universal 4/1 mbps coverage for the next 6 years. This lower standard will likely be met with a combination of last generation technologies like copper wire DSL and wireless that are incapable of meeting the 100/100 standard.

Continuing to build out older systems while deferring investments in fiber, which is adaptable to meet just about any future need, seems illogical. It’s a bit like saying you’re going to put all your expendable income for the next six years into repairing your VCR and buying tapes, while promising you’ll buy a DVD player immediately after. 

Vermont Draft Telecom Plan Fails to Deliver on Many Fronts

Last week, the Vermont Department of Public Service began a series of public hearings on the public comment draft of its State Telecommunications Plan. The plan is intended to asses the current state of the telecom landscape in Vermont, map out goals and benchmarks for the next 10 years, and provide recommendations for how to achieve them. The plan sets a target of 100 megabit per second symmetrical connections for every home and business in the state by 2024.

Oddly enough, achieving that even today would put them behind many metropolitan areas across the United States. The technology needed to deliver 100 Mbps connections is essentially the same that would be used to deliver 1 Gbps, begging the question why such a limited goal?

The 100/100 mbps symmetrical target is for 10 years into the future, but in the nearer term the plan calls for universal 4/1 Mbps coverage, raised to 10/1 Mbps coverage by 2020. While it may at first glance seem reasonable to set gradually rising targets, these long and short term goals actually have the potential to conflict with each other.

As pointed out by Vermont Public Radio, the 100/100 Mbps standard would likely require universal FTTH, or at least fiber to the node combined with other technological advances and investments. Meeting this goal would require a huge investment in next generation fiber optic infrastructure, yet the Telecommunications Plan calls for funding priorities to be focused on achieving universal 4/1 mbps coverage for the next 6 years. This lower standard will likely be met with a combination of last generation technologies like copper wire DSL and wireless that are incapable of meeting the 100/100 standard.

Continuing to build out older systems while deferring investments in fiber, which is adaptable to meet just about any future need, seems illogical. It’s a bit like saying you’re going to put all your expendable income for the next six years into repairing your VCR and buying tapes, while promising you’ll buy a DVD player immediately after. 

Vermont Draft Telecom Plan Fails to Deliver on Many Fronts

Last week, the Vermont Department of Public Service began a series of public hearings on the public comment draft of its State Telecommunications Plan. The plan is intended to asses the current state of the telecom landscape in Vermont, map out goals and benchmarks for the next 10 years, and provide recommendations for how to achieve them. The plan sets a target of 100 megabit per second symmetrical connections for every home and business in the state by 2024.

Oddly enough, achieving that even today would put them behind many metropolitan areas across the United States. The technology needed to deliver 100 Mbps connections is essentially the same that would be used to deliver 1 Gbps, begging the question why such a limited goal?

The 100/100 mbps symmetrical target is for 10 years into the future, but in the nearer term the plan calls for universal 4/1 Mbps coverage, raised to 10/1 Mbps coverage by 2020. While it may at first glance seem reasonable to set gradually rising targets, these long and short term goals actually have the potential to conflict with each other.

As pointed out by Vermont Public Radio, the 100/100 Mbps standard would likely require universal FTTH, or at least fiber to the node combined with other technological advances and investments. Meeting this goal would require a huge investment in next generation fiber optic infrastructure, yet the Telecommunications Plan calls for funding priorities to be focused on achieving universal 4/1 mbps coverage for the next 6 years. This lower standard will likely be met with a combination of last generation technologies like copper wire DSL and wireless that are incapable of meeting the 100/100 standard.

Continuing to build out older systems while deferring investments in fiber, which is adaptable to meet just about any future need, seems illogical. It’s a bit like saying you’re going to put all your expendable income for the next six years into repairing your VCR and buying tapes, while promising you’ll buy a DVD player immediately after. 

Vermont Draft Telecom Plan Fails to Deliver on Many Fronts

Last week, the Vermont Department of Public Service began a series of public hearings on the public comment draft of its State Telecommunications Plan. The plan is intended to asses the current state of the telecom landscape in Vermont, map out goals and benchmarks for the next 10 years, and provide recommendations for how to achieve them. The plan sets a target of 100 megabit per second symmetrical connections for every home and business in the state by 2024.

Oddly enough, achieving that even today would put them behind many metropolitan areas across the United States. The technology needed to deliver 100 Mbps connections is essentially the same that would be used to deliver 1 Gbps, begging the question why such a limited goal?

The 100/100 mbps symmetrical target is for 10 years into the future, but in the nearer term the plan calls for universal 4/1 Mbps coverage, raised to 10/1 Mbps coverage by 2020. While it may at first glance seem reasonable to set gradually rising targets, these long and short term goals actually have the potential to conflict with each other.

As pointed out by Vermont Public Radio, the 100/100 Mbps standard would likely require universal FTTH, or at least fiber to the node combined with other technological advances and investments. Meeting this goal would require a huge investment in next generation fiber optic infrastructure, yet the Telecommunications Plan calls for funding priorities to be focused on achieving universal 4/1 mbps coverage for the next 6 years. This lower standard will likely be met with a combination of last generation technologies like copper wire DSL and wireless that are incapable of meeting the 100/100 standard.

Continuing to build out older systems while deferring investments in fiber, which is adaptable to meet just about any future need, seems illogical. It’s a bit like saying you’re going to put all your expendable income for the next six years into repairing your VCR and buying tapes, while promising you’ll buy a DVD player immediately after. 

Vermont Draft Telecom Plan Fails to Deliver on Many Fronts

Last week, the Vermont Department of Public Service began a series of public hearings on the public comment draft of its State Telecommunications Plan. The plan is intended to asses the current state of the telecom landscape in Vermont, map out goals and benchmarks for the next 10 years, and provide recommendations for how to achieve them. The plan sets a target of 100 megabit per second symmetrical connections for every home and business in the state by 2024.

Oddly enough, achieving that even today would put them behind many metropolitan areas across the United States. The technology needed to deliver 100 Mbps connections is essentially the same that would be used to deliver 1 Gbps, begging the question why such a limited goal?

The 100/100 mbps symmetrical target is for 10 years into the future, but in the nearer term the plan calls for universal 4/1 Mbps coverage, raised to 10/1 Mbps coverage by 2020. While it may at first glance seem reasonable to set gradually rising targets, these long and short term goals actually have the potential to conflict with each other.

As pointed out by Vermont Public Radio, the 100/100 Mbps standard would likely require universal FTTH, or at least fiber to the node combined with other technological advances and investments. Meeting this goal would require a huge investment in next generation fiber optic infrastructure, yet the Telecommunications Plan calls for funding priorities to be focused on achieving universal 4/1 mbps coverage for the next 6 years. This lower standard will likely be met with a combination of last generation technologies like copper wire DSL and wireless that are incapable of meeting the 100/100 standard.

Continuing to build out older systems while deferring investments in fiber, which is adaptable to meet just about any future need, seems illogical. It’s a bit like saying you’re going to put all your expendable income for the next six years into repairing your VCR and buying tapes, while promising you’ll buy a DVD player immediately after. 

Vermont Draft Telecom Plan Fails to Deliver on Many Fronts

Last week, the Vermont Department of Public Service began a series of public hearings on the public comment draft of its State Telecommunications Plan. The plan is intended to asses the current state of the telecom landscape in Vermont, map out goals and benchmarks for the next 10 years, and provide recommendations for how to achieve them. The plan sets a target of 100 megabit per second symmetrical connections for every home and business in the state by 2024.

Oddly enough, achieving that even today would put them behind many metropolitan areas across the United States. The technology needed to deliver 100 Mbps connections is essentially the same that would be used to deliver 1 Gbps, begging the question why such a limited goal?

The 100/100 mbps symmetrical target is for 10 years into the future, but in the nearer term the plan calls for universal 4/1 Mbps coverage, raised to 10/1 Mbps coverage by 2020. While it may at first glance seem reasonable to set gradually rising targets, these long and short term goals actually have the potential to conflict with each other.

As pointed out by Vermont Public Radio, the 100/100 Mbps standard would likely require universal FTTH, or at least fiber to the node combined with other technological advances and investments. Meeting this goal would require a huge investment in next generation fiber optic infrastructure, yet the Telecommunications Plan calls for funding priorities to be focused on achieving universal 4/1 mbps coverage for the next 6 years. This lower standard will likely be met with a combination of last generation technologies like copper wire DSL and wireless that are incapable of meeting the 100/100 standard.

Continuing to build out older systems while deferring investments in fiber, which is adaptable to meet just about any future need, seems illogical. It’s a bit like saying you’re going to put all your expendable income for the next six years into repairing your VCR and buying tapes, while promising you’ll buy a DVD player immediately after. 

Gig.U Delivers its Gigabit to Maine

We continue to watch the Gig.U project with interest as some universities are teaming up with providers to deliver gigabit services to selected areas, generally around high tech campuses. One of the first project announcements has come from Orono, Maine. The University of Maine and a private company called GWI are teaming up to bring real broadband to Main Street. The gigabit announcement came on the heels of a major announcement from Time Warner Cable - they are increasing residential speeds in Maine from 8-10 Mbps (or from 15 to 20 Mbps for those speed demons) and doubling their upstream speeds from .5 to 1 Mbps (or from 1 to 2 Mbps for those living in the fast lane). So Orono, which is talking about speeds of 50-1000 times faster, should have quite the advantage. We last heard of GWI due to its involvement in the Three-Ring Binder project that brought middle mile connections throughout the state to start recovering from the long-standing underinvestment from Verizon (now FairPoint). We wrote about FairPoint's attempt to kill competition before it started. Now GWI will be building a gigabit open access network in this community that will offer much faster speeds at much lower prices than incumbent operators do. It is certainly an improvement over the status quo in the short term, as noted by the Bangor Daily News.
“We will plant the first seed in fertile economic soil,” he said.

Gig.U Delivers its Gigabit to Maine

We continue to watch the Gig.U project with interest as some universities are teaming up with providers to deliver gigabit services to selected areas, generally around high tech campuses. One of the first project announcements has come from Orono, Maine. The University of Maine and a private company called GWI are teaming up to bring real broadband to Main Street. The gigabit announcement came on the heels of a major announcement from Time Warner Cable - they are increasing residential speeds in Maine from 8-10 Mbps (or from 15 to 20 Mbps for those speed demons) and doubling their upstream speeds from .5 to 1 Mbps (or from 1 to 2 Mbps for those living in the fast lane). So Orono, which is talking about speeds of 50-1000 times faster, should have quite the advantage. We last heard of GWI due to its involvement in the Three-Ring Binder project that brought middle mile connections throughout the state to start recovering from the long-standing underinvestment from Verizon (now FairPoint). We wrote about FairPoint's attempt to kill competition before it started. Now GWI will be building a gigabit open access network in this community that will offer much faster speeds at much lower prices than incumbent operators do. It is certainly an improvement over the status quo in the short term, as noted by the Bangor Daily News.
“We will plant the first seed in fertile economic soil,” he said.